Main station|Member Center|Save the desktop|Mobile browsing
Ordinary Member

Guangzhou Da Shuai Building Material Technology Co

guangzhou, shenzhen, zhuhai, shantou, shaoguan, foshan, jiangmen, zhanjiang, ...

sell
  • There is no classification
contact
  • Contact:魏小姐
  • Phone:135-80432594
search
 
link
  • There is no link yet
home > sell > Zhuhai C45 high-strength non-shrink grouting material manufacturer 13580432594
Zhuhai C45 high-strength non-shrink grouting material manufacturer 13580432594
products: Views:7Zhuhai C45 high-strength non-shrink grouting material manufacturer 13580432594 
brand: 广州大帅高强无收缩灌浆料厂家
规格: 50
数量: 10000
厂家: 广州大帅
price: 100.00元/件
MOQ: 10 件
Total supply: 999999 件
Delivery date: Shipped within 3 days from the date of payment by the buyer
Valid until: Long-term validity
Last updated: 2016-07-10 17:54
 
Details
Maoming high-strength non-shrinkage grouting material manufacturer Huizhou epoxy repair mortar manufacturer Guangzhou Dashuai Building Materials Technology Co., Ltd.
Wei
Main products: High-strength non-shrinkage grouting material series
- Epoxy grouting material epoxy Repair mortar
- Bearing grouting material
High-strength emergency repair material High-strength polymer mortar High-performance self-leveling
Mortar (colorful) High-strength wear-resistant material Adhesive steel glue Planting reinforcement
Baogang Steel Grouting glue
Grouting glue, carbon glue, dry hanging glue, interface treatment agent, prestressing
Pipe grouting agent, wear-resistant floor hardener, etc. and product masterbatch
Professional grouting material manufacturer supplies National high-strength non-shrinkage grouting material non-shrinkage grouting material grouting material manufacturer grouting material price Zhongshan grouting material manufacturer direct sales concrete grouting material grouting material secondary grouting material bearing grouting material epoxy resin grouting material Shandong grouting material polyurethane grouting material grouting material formula High-strength grouting material Qingyuan grouting material manufacturer epoxy grouting material grouting material proportioning equipment grouting material equipment secondary grouting material power plant grouting material Shenzhen grouting material high temperature resistant grouting material grouting material solution weight grouting material purpose grouting material strength standard non-shrinkage grouting material concrete grouting Material price Guangzhou high-strength non-shrinkage grouting material Foshan epoxy grouting material manufacturer super-strength grouting material early-strength grouting material anchor bolt anchor grouting material
High-strength non-shrinkage grouting material manufacturer high-strength non-shrinkage grouting material manufacturer direct sales price
Step One: Foundation Treatment
The foundation surface should be chiseled. There should be no debris, floating slurry, floating ash, oil stains, release agents and other debris on the surface of the clean foundation.
The foundation surface should be fully moistened one hour before grouting and the accumulated water should be removed one hour before grouting.
Step 2: Support and touch
Set up the template according to the grouting construction drawing. The joints between the formwork and the foundation and between the formwork and the formwork should be sealed with cement slurry, tape, etc. to ensure that the entire formwork does not leak.
The horizontal distance between the formwork and the equipment base should be controlled to the left and right to facilitate grouting construction.
The top elevation of the template should be higher than the upper surface of the equipment base.
If grouting occurs during grouting, it should be dealt with in time.
Step 3: Preparation of grouting material
Generally, add water and stir according to the -% standard for the general reinforced type. Add water and stir according to the -% standard for the pisolite reinforced type.
It is recommended to use mechanical stirring method. The mixing time is generally - minutes (hand-operated electric drill type mixers are strictly prohibited). When using manual mixing, add / of water and mix for 1 minute, then add the remaining water and mix until uniform.
The amount of stirring each time should be determined according to the amount of use to ensure that the material is used up within minutes.
. It is strictly prohibited to mix any additives or external additives into the grouting material when used on site.
Step 4: Grouting construction method
For longer equipment or track foundations, segmented construction should be used.
, Illustrations of several commonly used grouting methods
, Secondary grouting should meet the following requirements.
① During secondary grouting, grouting should be carried out from multiple points on one side or adjacent two sides until it overflows from the other side to facilitate exhaust during the grouting process
Grouting shall not be carried out from all four sides at the same time.
②. After the grouting starts, it must be carried out continuously without interruption. And shorten the grouting time as much as possible.
③. Vibration is strictly prohibited during the grouting process. If necessary, a grouting booster can be used to push the grouting material along the bottom of the grouting layer. It is strictly forbidden to push from the middle or upper part of the grouting layer to ensure the homogeneity of the grouting layer.
④ After the equipment foundation grouting is completed, a bevel should be cut outwards along the edge of the equipment (see the figure below) within 1 hour after grouting to prevent free ends
If cracks occur and cannot be trimmed, they should be trimmed during grouting After - an hour, use a spatula to calender the surface of the grout layer.
⑤ When the thickness of the grouting layer exceeds the thickness of the grouting layer, pisolite-reinforced high-strength non-shrinkage grouting material should be used.
⑥. When the equipment foundation grouting volume is large, mechanical stirring should be used to stir the pisolite-reinforced grouting material to ensure grouting construction.
Step 5: Maintenance
After grouting is completed, it should be immediately covered with a wet grass cover or rock wool quilt and kept moist within minutes.
Maintenance measures during winter construction should also comply with the relevant provisions of the current reinforced concrete engineering construction and acceptance specifications ().
After the grouting material reaches the film removal time, the equipment can be installed. For the specific time, please refer to the relationship table between film removal and curing time and ambient temperature.
After the equipment foundation grouting is completed, if there is any part that needs to be removed, it can be removed gently with a spatula or
shovel tool - an hour after the grouting is completed and before the grouting layer hardens.
. The vibration of the running machine must not be transmitted to the equipment foundation. After the second grouting, the machine should be stopped for an hour to avoid damaging the unhardened grouting layer

High-strength non-shrinkage grouting material price
High-strength non-shrinkage grouting material manufacturer direct selling price
Packaging, storage and transportation
, packaging specifications: /bag Store in a ventilated and dry place And protect it from direct sunlight.
. The shelf life is one month. If it exceeds the shelf life, it should be re-inspected before it can be used.
, does not contain benzene series, halogenated hydrocarbons, formaldehyde, heavy metals and other ingredients, is non-toxic, odorless, non-polluting, non-flammable and non-explosive and can be transported as general cargo.
High strength non-shrinkage grouting material price
High strength non-shrinkage grouting material manufacturer High strength non-shrinkage grouting material manufacturer direct selling price
Request for quotation
A total of0articles  Related Comments: